PakCat catalogue record

Comments on Upper Sindh Hydel Project Stage-2 in Indian Held Kashmir 1984

Bibliographic details

Summary

According to the preliminary information funished by India, the scheme comprises following features:- a) Diversion weirs on Sindh at Sumbal and Wangath tributary at Wangath to feed two headrace link channels with designed capacities upto 48 cumecs [1700 cusecs] and 14 cumecs [500 cusecs] respectively. b) i) Sumbal Link with a length of 15.7 Kms [3.8 miles] through balancing reservoir with capacity of 270,000 m3 [9.5 million cft.] ending up in the common fore-bay. ii) Wangath Link with a length of 6.5 Kms [4.1 miles] through a balancing reservoir with capacity of 120,000 m3 [4.2 million cft.] ending up in the common fore -bay. c) Combined forebay to cater for the water delivered from sumbal and Wangath Links with a regulating capaility of 9400 m3 [0.3 million cft.] and a spilway for discharge of 52.4 cumecs [1850 cusecs]. d) i) Penstock of 3.0 meter dia, to handle 52.4 cumecs [1850 cusecs] for the proposed 2 units and third unit extension at a later date. ii) Maximum aggregate capacity of power units for firm/secondary power is 105 MW. Initially it is proposed to instal 2x35 MW units with future provision for addition of third 35 MW unit. Average gross head is estimated around 230 m [755 feet]. e) Tail race channel of 1.65 Km [1 miles] to outfall into Sindh river.(LB)