In this report, the levelling data sofar collected have been assembled. They include the benchmark levelling, the demarcation and levelling of the drain alignments and the drawings of length profiles for the first two drainage Blocks(Block T and Block 1) of the Khairpur East Tile Drainage Pilot Area. Some brief explanations of the procedures followed to arrive at the length profiles and the drain levels procade the actual information. These notes might provide some guidance in completing the data for the remaining blocks of the Khairpur East pilot area, and might also serve as a reference for similar work in other projects possibly taken up by DRIP in the future.