Groundwater and Reclamation Program Project No.5 Lower Rechna Doab, West Pakistan, 1966
Bibliographic details
Summary
The Proposed Salinity Control and Reclamation Project 5 is a part of the massive program of public works undertaken by the Water and Power Development Authority (WAPDA) for the development and distribution of irrigation water supplies to support the highest possible level of agriculture in the Northern Zone of the Indus Basin. Through exploitation and management of the ground water reservoir, full irrigation supply and drainage requirements will be satisified for about 1.7 million acres of the Project area, and supplies for the remaining 0.5 million acres will be increased greatly; drainage requirements will be met for the entire area. The Project involves the construction of about 2,300 tubewells of about 8,770 cusecs pumping capacity, and appropriate appurtunant distribution works and power facilities. The estimated capital cost of the Project is 328.3 million repees, including power facilities, of which 39 percent will be in foreign exchange for equipment, material and services not available in Pakistan. In addition to raising the level of agricultural production, the proposed amount of ground water pumping will depress the water table to depth sufficient to eliminate susbsurface drainage hazards and to provide storage for seasonal recharge, but will not represent an overdraft from the aquifer.(LB)