Development of Hydropower to Meet Energy Crisis of the Country 'Source Title' 68th Mid term Symposium on Need for Hydropower Development to Solve Energy Crisis, Lahore, April 1999. Vol.36
Bibliographic details
Summary
Pakistan despite being endowed with large indigenous hydro-power resources, has recently suffered a rapid switch over to expensive thermal power development which has caused a significant rise in tariff for consumers. The scenario of power generation was 60:40 hydel thermal in 1960 which has gone to 32:68 in 1997 due to the delay in commencement of ready hydro-power projects (Kalabagh/BAsha) and further delay on next projects in the pipeline. The economy of the country had to suffer not only in energy sector but also significantly in agriculture and industrial sector. The energy demand has an inclining trend and the power shortfall will keep on accumulating causing future energy crisis in the country. It is expected that the peak power demand in 2018 will be 46681 MW. It will result in shortage of 31625 MW required to be met through either hydel or expensive thermal development. HYDRO-POWER POTENTIAL: Pakistan located in an area blessed with abundant natural resources. The northern parts of Pakistan are the source of enormous runoff draining to number of streams and rivers conducive for hydro-power development. Only the River Indus has an identified hydro-power potential of about 30,000 MW, whereas total identified potential in the country is about 36,000 MW, out of which only 4825 MW has ben developed so far. DEVELOPMENT STRATEGY IN PUBLIC SECTOR: WAPDA since its inception is contributing for identification, preparation of engineering documents and implementation of hydro-power projects to keep abreast with the forecasted demands. The projects privatized for implementation were however delayed in commencement. Government of Pakistan, presently is giving priority for indigenous resource development including hydropower to account for the future energy shortfall due to increasing power demand. In this regard two major projects namely Ghazi Barotha and Chashma Hydro-power Projects are already in advanced implementation stages. WAPDA is contributing its part for the identification, planning and design of small, medium and major hydro-power projects in the country. A large number of such projects are planned at different levels of study from identification to detailed engineering and implementation stage. HEPO has prepared a proposal for implementaton and their investment to meet the future energy demand up to 2018, end of the 12th five year plan. HYDEL POWER POLICY: Government of Pakistan has sought investment opportunities from private sector for their role in hydro-power development, mainly due to financial constraint in public sector. Previous Private Power Policy frameworks have predominantly resulted in private investment in oil and gas fired power plants, mainly based on imports fuel). The govt now wants to paly a proactive role in promoting the indigenous coal and hydroelectric resources in power generation under new power policy 1998. CONCLUSINOS: The ingress of thermal generation to meet the energy crisis has caused a drastic increase in tariff and resulted in switching of by major consumers to their own energy resources, giving rise to another sort of crisis. Hydro-power development is the ultimate choice for filling the increasing power demand gap. It may be emphasized that the major hydro-power development should be carried out in public sector, whereas private sector be encouraged to participate in small to medium sized projects.