Mirani Dam Project, Mekran Baluchistan: Main Feasibility Report Volume Vol.3
Bibliographic details
Summary
The Dasht river lies in low rainfall zone and the runoff of this river is mostly in the form of flashy floods and offer storage possibilities by drawing up the supplies at a suitable site. A dam site at about 30 miles from Turbat has been selected for the construction of dam on the river and to store the water for irrigation purposes. ; The detailed hydrological studies, based on the available inadequate data, have revealed that a dam 115 ft high and 3500 ft long will be required to be constructed for the creation of a storage reservoir of 520,000 acre ft. The storage capacity has been determined purely on theoretical basis, which needs to be rationalized on the availability of further hydrological data. ; The reservoir is going to be a carry over type. The total storage capacity includes 20,000 acre ft of dead storage and 500,000 acre ft of live storage. The live storage is sufficient to take care of four year continuous drought period. ; The reservoir thus created will be able to yield a maximum of 125,000 acre ft per year of water for irrigation. ; The above mentioned manual supply is sufficient to irrigate a maximum of 32,352 acres of lands in this region. ; A cropping intensity of 90% has been selected for spreading benefits to maximum of area. The crops consumptive use water requirements have been computed by U.S. Weather Bureau method and based on a practicable cropping pattern for the area. ; The spillway discharge capacity has been fixed at 137,500 cusecs to pass the maximum design flood. The peak discharge of design flood has been determined to be 187,140 cusecs. The design flood hydrograph has been computed on the basis of limited available data. However, in case the flood discharge gets reduced in light of further data, the engineering design of the spillway will remain valid except very minor modification. It is because that the crest of the spillway has been kept low. ; Based on realistic cost factors and preliminary designs, the engineering works of the project are estimated to cost Rs. 244.11 million 'without' and Rs.290.00 million 'with' interest during construction. The annual operation, maintenance and repair charges are estimated at Rs. 2.00 million. ; The economic analysis of the project indicates a benefits cost ratio of 0.20:1 at 7.25% rate of interest and 0.18:1 at 10% rate of interest. Internal rate of return at which benefits equal the cost has been computed is much less than 7.25%. The project therefore, does not seem to be economical on conventional basis. As the area is very much under developed due to scarcity of water, the project feasibility may need not be judged purely on economics. ; The engineering works of the Project can be completed in a period of 5 year i.e. by 1979 if adequate funds are made available from year to year. ; The Project will go a long way in improving the economic condition of the people of the area. It will provide more food grains and more cash and help in raising the standard of living of people.