Survey and Evaluation of Delay Action Dams in Balochistan (Interim Report)
Bibliographic details
Summary
This interim report, in short, describes the status of the present situation in the study area and outlines the methodology to be followed to make an assesment of the impact made on the downstream groundwatr regime after the counstruction of delay action dams. Irrigation and Power Department, Government of Baluchistan, has constructed a number of delay action dams on ephemeral streams in different parts of the Province. The flood water is stored for the purpose of recharging groundwater aquifer. Based on climatological, topogrphic and geological conditions, five such dams for in-depth study have been selected. In order to evaluate the effectiveness of these dams, inflow, rate of recharging of aquifer and annual siltation shall be determined by developing mathematicl models and adopting empirical approaches. Use of existing facilities for the collection of basic data shall be made. This includes the collection of rainfall and evaporation data, ground water monitoring of selected wells and surface water flow measurement of karezes. Field trips are planned for the location of karezes, borholes and dug wells on topographic sheets. Use of computer facilities, if available, shall be made to ease the burden of manual calculations.