Appraisal Of Tubewell Pumping In SCARP-I 1970
Bibliographic details
Summary
Analysis of nearly 100 comprehensive specific capacity tests performed by operating Agency in Scarp-I(Fig.I) are reported.Results indicate that by June,1969 there was nearily 25 % reduction in the installed pumping capacity of tubewells in SCARP-I and by June 1973 the pumping capacity right reduce to 50% of the original.The increase in drawdown means a greater head,which results in greater consumption of electricity and hence higher cost of pumped water.