PakCat catalogue record

Feasibility Report Chitral Hydro-Electric Project in Lutkho River Chitral State, 1968

Bibliographic details

Summary

This report contains a proposal for providing electricity to the most important and fast developing town of Chitral - capital of Chitral State. The present hydroelectric development comprises of two units of 36 KW and 17 KW, which entirely cater the needs of the Palace of the Mehtar- i-Chitral, and residence and office of Assistant Political Agent. Another small unit of 7 KW is supplying power to some of the private individual shop owners in the market. Obviously, the present supplies are insufficient and present arrangements of power production are inadequate to meet future demands. Power market survey of Chitral town and its adjoining villages carried out by WAPDA indicated an immediate requirement of about 200 KW. To cater the needs of the Chitral town and adjoining villages, two alternate means of providing electricity viz. hydel generation and diesel generation were studied, and have been discussed in the report. Studies of comparative cost estimates have lead to the conclusion that hydroelectric development is the cheapest alternate. The hydel project as proposed in this report envisages to produce 400 KW by diverting about 80 cusecs of water from Lutkho river into a remodelled existing irrigational channel about 12,150 feet in length, taking off from the right bank of Lutkho river and discharging into a reinforced concrete forebay, wherefrom water would be dropped by means of a steel penstock of 30 inches diameter through a gross head of 102 feet. Analysis of load-growth-rate indicated that initially one turbogenerator unit of 200 KW rated capacity shall suffice for about first five years. With the increase in demand two more units of 100 each can later be added in stages. The total cost of generation and transmission of 200 KW initially, with provision in civil works for an extension of installed capacity to 400 KW works out to be Rs.12,16,500 with a foreign exchange component equivalent to Rs. 1,08,700. Two units of 100 KW proposed to be installed later would require an additional capital investment of Rs.4,34,100 with foreign exchange component equal to Rs. 1,48,000. The total annual cost of operation and maintenance, including five per cent interest, for the initial installed capacity to 400 KW works out to be Rs. 12,16,500 with a foreign exchange component equivalent to Rs.1,08,700. Two units of 100 KW proposed to be installed later would require an additional capital investment of Rs. 4,34,100 with foreign exchange components equal to Rs. 1,48,000. The total annual cost of operation and maintenance, including five per cent interest, for the initial installed capacity of 200 KW would be Rs. 91,000. The second alternative studied for the purpose of comparison comprised of electric generation by means of conventional diesel generator of 200 KW rated capacity. In this case, the power house will be in the heart of the load-centre and hence the need for transmission system would be eliminated. The capital investment for diesel generation has been estimated to Rs. 2,42,500 with a foreign exchange component of Rs. 90,000. The annual cost of generation for equal quantity of electric power would be Rs. 3,46,500. In view of high cost of annual operation and maintenance of diesel generation, it has been concluded that the hydroelectric development for the Chitral town is technically feasible and economically sound, and hence is recommended for early implementation.