Hydrologic Monitoring and Tubewell Performance, Fordwah Eastern Sidiqia Unit-II, Phase-A, of Scarp-VIII (1990-91)
Bibliographic details
Summary
The actual discharge capacity of the tested tubewells is 21.14 percent more than the designed discharge. The reduction in median specific capacity between acceptance and subsequent test was nil during 1990-91. This was based on the test performed on 20 tubewells only. In 1990-91, the specific capacity of 7 and 7 tubewells reduced from 1 to 15 percent and 16-25 percent, whereas two tubewells showed reduction between 26 to 30 percent, and remaining three between 31 to 40 percent. None of the tested tubewells was found giving sand. The wire to water efficiency of the tested tubewells ranged from 24 to 71 percent. Out of 17 tested tubewells, 13 tubewells ranged from 30 to 71 percent. Efficiency values in the range of 30 to 71 percent are hardly indicative of very efficient functioning of these tubewells after the short operational span and needs attention. The disaster area (0-150 Cms) during June 1991 was 10.0 percent more as compared to June, 1990 which was due to 7.65 percent more canal supplies as well as 67 percent less pumpage during 1990-91. It is proposed that canal supplies may be restricted to crop requirements and tubewell pumpage should be increased to targeted value to effect future decrease in disaster area. (L.B.)