Feasibility Report Command Water Management Project Warsak Lift Canal Unit (NWFP), 1983

Bibliographic details

Summary

The project covers a gross area of 54599 Acres with culturable commanded area as 43369 Acres. The project area is receiving its irrigation supplies through Warsak Lift canal system originally designed for a discarhge of 200 cusecs. The water to the canal at its offtake point is being lifted by a pumping station through a head of 196 ft. The present cropping intensity in the area is 87% (Karif 39%, Rabi 48%). The feasibility report provides the basic data, the existing restraints and the proposed development plan with associated project components, the capital cost and evaluation of the accruing benefits. The development approach is mainly oriented for implementations of water delivery schedules, rehabilitation of implementations of water delivery schedules, rehabilitation of distribution system above and below the canal outlets, water management at farm level, adequate and timely utilization of good quality fram inputs for boosting crop growth. The capital cost of the project has been estimated as Rs. 47.46 million. The operation and maintenance cost works out as Rs. 4.13 million. The benefit cost ration at 15% discount rate is 1.23:1. The internal rate of return for the project is 19.66%.(LB)