Case Study of the Damodar Valley Corporation and its Projects
Bibliographic details
Summary
After much deliberation, it was decided that the Tilaiya dam on the Barakar and the Konar dam on the Konar river, a tributary of the Damodar, should be consturcted. On completion of these two reservoirs, construction of the two larger downstream dam would be somewhat simplified at Maithon and Panche Hill, across the Barakar and Damodar respectively. The Tilaiya dam structure was completed in February 1953, the Konar dam about September 1955, the Maithon dam in 1957 and Panchet Hill dam at the end of 1959. Those reserviours now yield a total capacity of 2.9 million acre feet, whereas to provide adequate flood protection a storage capacity of 5.3 million acre feet is required. The four reservoir capacites now in operation and their equivalent flood benefits are given.(LB)