Project Report Pabbi Salinity Control and Reclamation Pilot Project, 1971
Bibliographic details
Summary
The pabbi pilot project is one of the projects prepared to arrest the for spreading menace of waterlogging and salinity in the valley of Peshawar. Parts of Peshawar Vale face the most serious drainage and water shortage problem. It was originally proposed to prepare a development plan for the whole valley. The investigations for this purpose had been in progress since the openning of Warsak Canal System. But upon it was found that a number of important parameters were still undetermined. The exegencies of the situation demanded however, a quick solution, especially in the area where the intensity of waterlogging and salinity was comparatively greater. The original scheme of planning a reclamation project for the valley of Peshawar has been restricted to the preparation of pilot projects for particular areas. These projects apart from being conductive to alleviating the problem of waterlogging, shall be used for post project studies to determine their effectiveness and economics for guidance in planning future projects in complex areas in Peshawar Vale. The pilot project proposed for Pabbi comprises the installation of 86 new tubewells and the rehabilitation of 11 existing tubewells with a total installed capacity of 150 cusecs. The cost of the project is estimated to be Rs. 11.2 millions and the benefit cost ratio of Rs. 5.1:1