PakCat catalogue record

Pehur High Level Link Canal Project (Preliminary Report)

Bibliographic details

Summary

Peshawar Vale in the north-west is endowed by nature with abundant water and fertile land. Swabi tehsil, where agriculture dominates the economic activity, is the least developed in the entire Peshawar Vale. Major improvement in the irrigation water supply is the dire necessity of the area. The Pehur High Level Link Canal will off-take from the right bank of Tarbela reservoir through an Irrigation Release Tunnel. The 19 miles long Link Canal lined in the first seventeen miles with a full supply capacity of 750 cusecs will run along the toe of hills to join Machai Branch. The project is estimated to cost Rs. 85.33 million with a foreign exchange component of Rs.27.11 million. The project area will have 1,34,000 culturable acres out of which 87,000 acres presently receive inadequate irrigation supplies through Machai Branch where the prevalent irrigation intensity is 100% whereas the rest 47,000 acres are barren or barrani farmed. It is proposed to provide adquate irrigation supplies to both barrani as well as the already irrigated areas to achieve irrigation intensities of 140%. The project is technically and economically feasible. In concrete terms the benefit cost ratio of this project has been worked out as 2.63:1 at 10% interest rate which is opportunitly cost of capital, but taking into account various socio-economic advantages the overall benefits to the area would go a long way in removing the economic disparities existing in the region.