Kalabagh Dam Project; Hydro Meteorological Facilities; Proposal for Future Data Collection
Bibliographic details
Summary
This report is prepared to identify further steps needed to improve the existing network of hydrometeorological system of the project basin keeping in view the specific aspects which would be associated in the construction and operation phases of the project. Recommendations made are briefly described below: (1) Recording rain guages should be installed at stations which are presently non-recording. Out of 12 stations included under this proposal, 3 belong to PMS, 3 to SWHP and the remaining to provincial departments. It is suggested that the maintenance of these 3 stations of provincial departments may be taken up by SWHP. (2) To improve the overall quality of rain data it is desirable that central control preferably by PMS or SWHP should be made for the maintenance of rainfall stations belonging to provincial departments. (3) Kalabagh reservoir waters will effect 3 key hydrological suggested that these stations; namely Mandori, Gariala and Nowshera. It is suggested that these stations should however remain in operation till the impounding of the reservoir. Thereafter Warsak on Kabul and Sanjwal on Haro river should be restarted by SWHP to replace Nowshera and Gariala respectively. Need to establish a new gauge discharge station on Indus river to replace Mandori has however not been found necessary in view of Tarbela dam acting as the control structure. However a sediment measuring station at or downstream of Tarbela dam will be required to be set up. (4) In order to improve the existing gauging facilities within the project basin it is suggested that water level recorders should invariably be installed replacing the manually operated staff gauges at all the key stations where such a facility does not exist. (5) A VHF receiving station should be set up at Kalabagh damsite and linked with the existing network connecting Besham Qila, Tarbela, Chakdara, Nowshera, Mandori and Dhok Pathan. (6) Frequency of discharge observations particularly at high flows should be increased with a view to obtain actual flow ratings and to minimise extrapolations. (7) SWHP gauge discharge stations at Jarma Weir and Risalpur which were in operation in the past should be restarted.