Feasibility Report on Salinity Control and Reclamation Project No.3 Lower Thal Doab, West Pakistan, 1963
Bibliographic details
Summary
Salinity control and reclamation project number three of the west Pakistan Water and Power Development Authority is one of a series of reclamation projects designed to raise the agricultural production of West Pakistan from its present low level to a level at which the country can become more than self sufficient in food and fiber. Insufficient irrigation water, coupled with inadequate drainage, have given rise to extensive damage to the land by waterlogging and salinity. Through the use of tubewells, the project will provide drainage plus supplemental water supplies, making possible not only the reclamation of the affected lands, but overall increase in productivity. The project area embraces some 1900 square miles in the southern part of Thal (Sind Sagar) Doab, near the confluence of the Indus and Chenab rivers. Of this area 1,000,000 acres are commanded by the Rangpur and Muzaffargarh canal systems. Crop yields and agricultural production are low in the area, even in relation to the rest of West Pakistan, largely because of the inadequacy of the canals to supply water at the critical times, and the absence of winter supplies. The areal has long been irrigated by inundation canal, which have more recently been converted to weir control, but still have only six months (nonperennial) supplies. Waterlogging and salinity are old problems in the area, but have been intensified by the construction of the weir controlled canals. At present 50 per cent of the land is affected by salinity in varying degress of severity and there are indications that the problem is worsening with the spread of waterlogging. The solution to the problem lies in providing adequate irrigation supplies plus effective drainage so that water not used by the crops can move downward and carry the salts below the root zone of the plants. The two requirements of additional and carry the salts below the root zone of the plants. The two requirements of additional water and effective drainage can be achieved through the installation of tubewells. The tubewells provide additional water through recovery of the leakage losses of the irrigation system. This recharge from the irrigation system is now dissipated through nonbeneficial evapotranspiration from the water table. The act of pumping the tubewells and using the greater part of the pumpage for crop irrigation lowers the water table, permits the estlishment of efficient drainage, and converts presently nonbenefial losses into irrigation supplies. The Project that has been conceived to accomplish the above objectives embodies the construction of some 1550 tubewells and appurtenant facilities. It also includes the contruction of 150 miles of surface drains to minimize crop damage due to ponding of storm runoff. Only minor changes in the canal system will be necessary to provide adequate irrigation supplies to areas underlain by ground water unfit for direct use in irrigation. An analysis of the hydrology of the aquifer indicates that about two million acre feet of ground water can be pumped annually without lowering the level of the water table to the point where pump lifts become excessive. Both drainage and adequate water supplies are therefore assured. Most of the annual pumpage, 1.87 MAF, will be delivered at the heads of watercourses of the irrigation system. The remaining 109,000 acre feet, being of unsuitable quality for direct use as irrigation water, will be in part pumped into canals for mixing, the rest will be disposed of to the rivers through drains. The supplemental ground water made available for irrigation will make it possible to supply otimum crop water requirements for a much greater cropped acreage than at present. In addition, the crop yields per acre can be more than doubled. The entire project, including the power facilities, has been estimated to cost 228 million rupees; 55 percent of the project cost will be required in foreign exchange for the purpose of obtaining equipment, materilas, and services not presently available in Pakistan. The economic feasibility of the project is demonstratable. During the early stages of development, benefits should be more than double the annual costs of the project, and will rise to several times that ratio upon more complete development. the increase in net value of crop production in a single year at optimum development will be grater than the total original cost of the project.