Measurement of Recharge Rates Through an Unsaturated Glacial Till by Tritium Analysis
Bibliographic details
Summary
Measurement of the penetration depth of bomb-derived tritium is a relatively simple, yet effective method for measuring the average annual recharge rate through the vadose zone. The tritium profile obtained in core BN-1, located on the upland till plain near West Lafayette, Indiana, showed a definite low-high-low signal at depth, indicating the position of recharge water derived from 1963/64 precipitation. the recharge rate calculated using the depth of penetration of the 1963/64 peak as well as by comparing the amount of tritium held in the vadose zone with that available for recharge since 1963/64, is 36 mm/yr (1.4 in/yr). This is in reasonable agreement with Arihood's (1982) estimate of 51 to 114 mm/yr (2 to 4.5 in/yr) for tills based on his numerical groundwater-flow model. Two other cores, located on a slope topographically lower than BN-1, showed no definite reversal in tritium concentration. This is probably due to lateral flow components at these locations.