Manpower Requirements in Hydropower Engineering 'Source Title' 68th Mid term Symposium on Need for Hydropower Development to Solve Energy Crisis, Lahore, April 1999. Vol.36
Bibliographic details
Summary
Sufficient qualified technical personnel are necessary for a sustainable development of the available hydro-power resources of Pakistan. The energy requirements of the country should not be satisfied only on emergency basis. A well-organized and systematic approach is needed, with maximum participation of local experts, especially engineers. Traditionally, foreign consulting and construction companies have carried out planning, design and implementation of medium and large size projects, such as Nandipur, Shadiwal, Warsak, Mangla, Tarbela and other plants. The activities of local engineers have concentrated on the implementation of small projects, the majority constructed in the north of the country. Regrettably, due to lack of expertise, many of these projects are not performing satisfactorily. Most of the plants have been constructed with temporary diversion works and without sand traps, leading to a quick deterioration of the rotating parts of the turbines. The situation is aggravated by low quality workmanship, causing poor performance, frequent outages of the plants due to damage of the project components. A sizeable hydro-power potential has ben identified within the Indus Irrigation system and in the north of the country. Feasibility studies are available or in progress for some low head projects at barrages and canal falls in the plains as well as for medium and high-head projects on Indus river and its tributaries in the north of the country. WAPDA at national level and SHYDO at provincial level have carried out the majority of these works with the collaboration of foreign personnel. Only a limited number of Pakistani professionals have participated in these activities. Due to prevailing institutional policies, rotation of personnel is unavoidable. Therefore, the continuous involvement of local professionals working in governmental institutions is not ensured. It has happened many times that the trained persons (through on the job or formally trained) have been transferred to other quarters to carry out totally unrelated works, wasting completely their gained knowledge and skills. To ensure the desperately sought self-reliance and autarchy in the energy sector Pakistan needs to institutionalize the development of specialized manpower in all relevant fields. Training activities should continue within the governmental institutions, such as the WAPDA Engineering Academy at Faisalabad. However, specific courses and programmes need also to be introduced at university level. This is especially important to provide the necessary manpower to implement projects in the private sector. In this connection, CEWRE/UET Lahore and GTZ have been jointly working with the aim to establish a post-graduate programme in "Hydro-power Engineering". Two short courses have already been carried out in the last six months with quite satisfactory results. Efforts are under way to start a new degree programme in Hydro-power at the Centre.