Panjnad-Abbasia Salinity Control and Reclamation Project (SCARP-VI) Planning Report for Units II,III,IV & V, 1976

Bibliographic details

Summary

In 1974 a comprehensive report has been presented on Allahabad Pilot Project (Unit-I) of SCARP Panjnad-Abbasia covering an area of 2,16,234 acres. Construction work on tubewells in Unit-I is already in progress. This Planning Report present the remaining area of 14,60,286 acres covered by SCARP Panjnad-Abbasia. This area has been subdivided into four development units i.e. Units-II, III, IV and V. Thus the entire area of SCARP VI i.e. 16,76,520 acres has been planned by us for development. In this report installation of 2144 Irrigation Tubewells for development of 8,00,720 acres in non-saline zone is proposed. Drainage Tubewells numering 391 are proposed in the intermediate zone. Out of the remaining 178 Drainage Tubewells only 26 will be used for experiments on saline water agriculture. In all 2713 Tubewells are propose to be installed for eradication of the evils of salinity and waterlogging.(LB)