Development of Low Discharge Shallow Well for Skimming Fresh Water 1992
Bibliographic details
Summary
Salt water up-conning and intrusion is a big problem in many parts of the country where thickness of fresh water layer is limited and underlain by saline groundwater. For water supply augmentation and vertical drainage WAPDA started the installation of series of tubewells all over in the country under salinity control and reclamation project programme in early sixties. It was discovered during sub surface investigation of different projects that in some areas saline groundwater underlies the usable quality groundwater and the thickness of usable groundwater is limited. Also some of installed tubewells in such areas started pumping saline water due to continuous pumping of water from aquifer. This report summarizes the field research conducted for water supply augmentation through development of shallow well technology. The Indus plain is underlain by a huge water bearing aquifer framed by alluvial deposit in a rift valley containing native saline water. In the upper portion however, the fresh water has accumulated through seepage and percolation of water caused by rainfall, canal net work and field application of water for irrigation. For exploitation of fresh thin layer of water the research study was initiated to determine the effect of low discharge skimming well technology on watertable, crop production and to test skimming fresh water for irrigation purpose without disturbing the underlain brackish water. One tubewell having the average discharge of 0.47 cusecs was installed in the tail command of watercourse 15-AL Suhi Kandher distributary. Initially the well was operated for about 8 hours in a day. Average draw down for 30 days recorded at the time of well closing was observed 3.3, 2.4, 2.0 and 0.9 ft. at the distance of 10, 50, 100 and 150 ft. respectively. After one month period operating hours were increased from 3 to 10 hours daily and observed draw down at the same distance was 3.5, 2.7, 2.37 and 1.25 ft. for the period of next 30 days. Performance of well regarding the specific yield, quality of pumped water and effect of water supply augmentation on cropping intensity and yield on watercourse command basis etc. has been studied. Changes during the monitoring, if any are being recorded. Economically, the technology was found adoptable, because during the last six seasons farmers have received remarkable agricultural production.