PakCat catalogue record

Project Report, Balloki - Suleimanki Link II, Drainage Project

Bibliographic details

Summary

1. Balloki-Suleimanki Lin II (B.S II) forms the third and last segment of R.Q.B.S Link system and has a designed capacity of 6500 cusecs. It is one of the eight link canlas that were constructed as replacement works under Indus Water Treaty. Transportation of water through unlined channels created waterlogging conditions in the adjoining cultivable areas. Nother substantial could be done till Indus Basin Development Board asked WAPDA in 1973 for detailed studies of adverse affects of link canals and required remedial measures. ; 2 Four drainage Project reports suggesting antiwaterlogging measures along the link canals have been submitted in respect of Chashma-Jhelum Link, Taunsa-Punjnad Link, Trimmu-Sidhnai-Mailsi-Cahawal Link and Rasul -Qadirabad-Balloki Link. This report which is the last of the series, identifies the problem and desired solution to drain the area lying in the immediate vicinity of B.S.II Link. ; 3 Investigations in an area comprising 223829 acres falling in 5 miles belts on either side of the link canal have been carried out to estimate the extent and magnitude of the problem. It has been identified that nearly 34721 acres of cultivable land spread over 39 villages have been adversely affected causing an estimated annula (1976-77) loss of 9.9 million rupees. the link operates mostly during Kharif according to the and it carries a nominal discharge rendered surplus from Balloki Barrage during Rabi. Waterlogging conditions hider the land preparation for Rabi Cropping. ; 4 The proposal envisages installation of 25 tubewells of 2.5 cfs. capacity each, along the link canal and in the waterlogged area enclosed by 3 feet depth to water table contour for September. The disposal of the effluent is proposed in the drainage channels or the link canal. However, water can be used for irrigation purposes where feasible especially on the left bank where the cultivable area lies on the tail end of the irrigation channels after construction of B.S Link. ; 5 The total cost of the scheme is estimated at 14.5 million rupees, of which the tubewell cost is 4.9 million rupees, disposal works 1.95 million rupees and electrification 6.56 million rupees. ; 6 the annual operation and maintenance cost is 0.82 million rupees. there is a tremendous development of private tubewells in the area. As the tubewells are mostly diesel operated, the farmers use their tube wells to the barest minimum because of high cost of diesel. If the electrification facilities are extended it is expected that the farmers will convert their diesel tubewells to electri tubewells. ; 7. In the alternate proposal it is proposed to lay electric line sand encourage the farmers to get their tubewells electrified and in addition encourage the farmers to install 100 new tubewells in the waterlogged area at a subsidy of Rs.3000 per tubewell. The cost of the alternative proposal is 8.56 million rupees which is mostly for supply of electricity. The tubewell subsidy is only 0.3 million rupees. Electrification of the area has to be made under Village Electricfication waterlogging problem can be tackled without installation of public tubewells.