Flood Protection of Pat Feeder & Kirthar Canal Planning and Design Report Text and Exhibits, 1981 Volume Vol.1

Bibliographic details

Summary

The project is located in a highly sensitive and different Marri-Bughti terrain, and most of the hydrometeorologic and topographic data reqired for the formulation of an effective flood control plan were not readily available. Embankment along reach RD 399 to RD 587 of Pat Feeder has been designed for a storm of 15-year return period. The safety factory would improve to more than 25-year return period after the implementation of proposed remedial measures. All other embankments along Pat Feeder and Kirthar Canal have been designed for a flood of 25-year return period. Water surface profiles have been determined for the entire length of Pat Feeder and Kirthan Canal (Baluchistan Portion). Bund levels have been proposed in accordance with the free-board computed from the fetch, wave height and runup of 25-year event.(LB)