Summary

In order to select an area, suitable to reach the mentioned objectives,and thus also meeting the listed requirements,DRIP has made surveys through the sind province, and ultimatoly decided to start a first pilot scheme in Khairpur-East.In this region, where DRIP will work in close cooperation with WAPDA,the first large scale tile drainage project of Pakistan will be implemented:The Khairpur-East Tile Drainage Project,situated between the SCARP Khairpur and the Rohri Limestone hills.(see fig.1,and map 1).The objectives of DRIP for its pilot area are in accordance with WAPDA's objectives 1 and 2 as stated in the P.C.1 for this KHETD Project (ref.12).Realization of objective no 3:'development of the small Khairpur-East area',will be stimulated both by the research exporience from the DRIP pilot project and by the implementation of the 14.000 ha project.As yet insufficient technical know how is available in Pakistan,which would enable the execution of such a large area at once, so it is necessary to gain some experience on smaller scale first. On a DRIP pilot project,situated in the 14.000 ha project, experience may be obtained regarding the mechanical installation of the drains, and the operation and maintenance of a tile drainage system. For this purpose DRIP has selected an area of approximately 640 ha north of Kot Diji. The information from this pilot project will be available to WAPDA and will be useful for large scale application of tile drains. In this concept of cooperation between DRIP and WAPDA tile drainage will most effectively be introduced in Pakistan.