PakCat catalogue record

Hydrologic Monitoring and Tubewell Performance in Shikarpur Tubewell Pilot Project 1976-77

Bibliographic details

Summary

The salient conclusions derived from the analysis presented in the report are:- ; 1. Average working of 16 direct disposal tubewells during July, August and September was only 3.3, 4.1 and 5.8 hours per day respectively. Average working of all the 50 hours per day respectively. Average working of all the 50 tubewells during the year under report was only 7.5 hours per day. ; 2. The average static water level below general land surface observed during April, 1976 and April 1977 was 10.9 feet and 11.1 feet respectively. Watertable has lowered by only 0.2 feet. ; 3. Insignificant lowering of watertable is due to abnormally high rains and low pumpage during abkalani season. ; 4. The pumping capacity of the Project tubewells has increased by about 1 percent since acceptance. ; 5. The median value of specific capacities of tubewells has decreased by about 3 percent since acceptance. Specific capacities of 76 percent tubewells have reduced, 12 percent have not undergone any change since acceptance and 12 percent show increase. ; 6. None of the project tubewells was found to have any sand blowing problem. ; 7. Wire to water effeciency of tubewells ranges from 49 to 61 percent.