Feasibility of Tubewell Irrigation in Nepal Confidential, 1967
Bibliographic details
Summary
Main Irrigation Projects of the country are based upon seasonal monsoon fed rivers. Their supplies are dependant upon the intensity of monsoon and their periods of activity. A delay in the monsoon and their earlier stoppage, causes disaster to crops. Seven months in a year, the country is dry as 70% of the rain occurs during the monsoon period. In a country with limited arable lands even a few thousand acres remaining uncommanded in a project area, is a great loss to the country. The country has immense source of surface water nearly equal to 171.0 maf., and several big pernnial rivers. Diversion works on big rivers are costly. The arable land is criss-crossed with innumerable natural drainages so that the areas are small segments. Big canals with high discharges are not feasible. Small projects are being developed, these need augumentation of their water supplies. Evidentlly ground water is one means to stablilize the defficiencies, to meet with sudden failure of monsoon and even to irrigate lands at high elevation beyond the command of irrigation canals. At present there is little information available about the ground water potential. Unless the availability of ground water, its yield and storage is known, no project for its exploitation can be successful. This note thus deals with basic principals to determine the ground-water potential & its yield. (LB)