Hydro Electric Project Kargah, Gilgit, Design Report
Bibliographic details
Summary
(1) A flow duration curve has been developed by the Hydrologist of HEP which has to be accepted with caution as it is based on very scanty hydrological data. As such we have deviated from the normal practise of designing the Power House at Q 40 which is equivalent to a discharge of 140 Cs: and gives an installed capacity of 6.0 MW. Similarly with the proposed arrangement of diversion from Kargah Nullah a diversion of 80 - 90% is likely to be achieved, as such the installed capacity of the Power House has been limited to and kept as 3.0 MW. (2) However the necessity of collecting more hydrological data, of at least 10 years, of flows as well as the sediment load cannot be over- emphasized. The sediment data of a few months as provided by HEP is very inadequate. It shows very little sediment load and as such the present/proposed arrangement of a silt trap in Power Channel No.V, a silt excluder in Forebay V and a silt excluder in Forebay VI is adequate. However if the sediment data collected hereafter shows greater concentration of load especially during Summer months, more sophisticated and effective measures and arrnagements for exclusion of silt at the intake and in the Forebay VI may become necessary. (3) No geological mapping and sub-surface explorations were carried out at the weir sitae and as such we are in complete darkness as to the strata lying beneath the surface. It has been presumed that no rock is available at shallow depths, also permeability of the underlying strata does not improve with depth. In case it is established that rock is available at shallow depth or the permeability of underlying strata does improve with depth, the possibility of providing a positive cut-off in the weir section can further be studied.