Performance of Coir String Strainer Tubewells Installed in the Saline Water of Ghulam Mohammad Barrage Area. Results of Tests Conducted on Nov. 1961
Bibliographic details
Summary
Seven tubewell with coir string were installed in Gaja Area of Ghulam Mohammad Barrage in July-August 1960. These are in operation since October & November 1960. A performance test report of these wells was issued in January 1961. The present is another report giving the results of performance of all the seven tubewells after working them for another ten months. The characteristics of these tubewells is that:- 1) These are installed in a formation which is very fine the mean diamoter of which is between 0.13 to 0.15mm. containing 4 to 10 percent particles of silt. ii) Their strainers are made of coir string wound around an iron cage.(LB)