PakCat catalogue record

Project Report Trimmu-Sidhnai Mailsi-Bahawal links canal Drainage Project, 1975

Bibliographic details

Summary

Investigations were taken up for the Trimmu-Sidhnai -Mailsi-Bahawal Link Canal System, however, it was learnt that the problem of waterlogging was acute in the immediate vicinity of Trimmu-Sidhani link whereas there was no such problem in the immediate vicinity of Sidhai-Mailsi-Bahawal canals. This report deals mainly with the problem of waterlogging and its tentative solution for Trimmu-Sidhnai link. The prevailing conditions (june 1975) for Sidhnai -Mailsi-Bahawal link have been discussed in the Annexure. The Extent of the damage dtermined in the vicinity of Trimmu Sidhai link canal cannot be regarded as final, however, the proposal contained herein envisages to alleviate the problem of waterlogging to a considerable extent. An area of 2,31,000 acres was surveyed in 5 miles belt on either side of the link canal to estimate the extent of waterlogging. Seepage from the Trimmu-Sidhnai link canal has been estimated as 12 cusecs per mile and 3 cusecs per mile for Haveli canal. Drainable surplur of 2 cusecs per square mile has been estimated on SCARP experience for areas away from the link for tubewell proposal and 1.5 cusecs per square mile as recommended by IACA for tile drainage areas. The tubewells have been mostly proposed in a line along the link canal and are expected to intercept 67 percent of the seepage from it. Utilization of the draiange tubewells has been proposed at 80 percent. Tile drained with shallow tubewells, since it is not possible to lay tile drains there.(LB)