Chronological Evolution of Flood Forecasting and Warning Centre, Current Problems and Future Prospects 'Source Title' Proceedings of the National Workshop on Water Resources Achievements and Issues in 20th Century and Challenges for the Next Millennium, Islamabad - Pakistan, 28-30 June 1999
Bibliographic details
Summary
Floods are the most devastating natural hazard in Pakistan. Floods of 1928 and 1929 are the historical land mark in the hydrological history of the country. Floods of 1955,1973,1976,1988 and recently that of 1992 are the sad yet memorable hydrological events entailing tremendous damage to the life and property. Commensurate with the present day trend, the flood mitigation policy in the country consisted of both the structural measures as well as the measures mainly evolved around the establishment of the flood forecasting and warning system. Pakistan Met.Deptt.(PMD) was the natural and most logical choice for assigning the flood forecasting responsibility as the floods in Pakistan are caused by the heavy monsoon rains due to the monsoon lows / depressions, the identification and tracking of which obviously fell within the functional domain of the PMD. PMD established a flood forecasting unit within the Regional Meteorological Center, Lahore where Meteorological charts /maps were used to detect the approaching monsoon depressions. Coaxial rainfall/runoff methods were formulated and used to forecast the floods at the rim stations which were then routed down stream using some rudimentary flood routing methods. However after the floods of 1971 and 1973, it was decided to modernise the system. While planing for this was going on, the flood of 1976 occurred which gave further impetus to modernizing activity. Consequently a project was formed with the assistance of Word Meteorological Organization and the Govt of Nether- lands. The project resulted in the establishment of computerised flood forecasting models, a weather radar at Sialkot, a satellite receiving system and an automatic rainfall and discharge data measurement and transmission system. The project went over almost ten years period. Regrettably, however, the desired results could not be achieved because of the inappropriate equipment and improper models. Additionally the quality of discharge data also remained extremely poor. In the mean time, PMD's flood forecasting center successfully devised new methods/procedures to make best use of the limited facilities provided under the project, but the timely dissemination of the flood forecast / warnings to the public and the Govt. Organization proved an extremely weaker link, because of the indifferent attitude of the representatives of various organizations posted to Flood Waning Center. The Centre functioned under the Relief Commissioner Punjab, who remained heavily dependent upon the technical advice of the Irrigation deptt. Thus under the set up, where as the flood forecasting was the responsibility of the PMD, the dissemination of the forecasts and the subsequent activity was out side the domain of the PMD. Unfortunately because of the uncalled professional rivalries between PMD and other flood related organizations specially the Irrigation deptts and WAPDA etc. the timely dissemination of some of the most vital flood forecasts could not be done and thus the benefit of the improved flood forecasting activity was denied to the nation. The paper deals with the problem faced by the flood Forecasting and Warning System in the country, action needed to over come the existing problems. Contents of the new flood forecasting project its plus and minus points are brought out. Problem due to non use of the two reservoirs for the purposes of flood mitigation is illustrated. At the end, the way out of the present problem is indicated to help establish the most appropriate approach in establishing the truly modern flood forecasting and warning system in Pakistan.