Probable Maximum Flood with Limited Data of Mirani Dam Project 'Source Title' Bulletin of Irrigation, Drainage and Flood Control Research Council Volume Vol.20, No.1
Bibliographic details
Summary
Probable maximum flood (PMF) in Dasht river at Mirani dam site is investigated. Depending upon the magnitude of the data and its quality, statistical approach is adopted for the analysis. In this statistical appraoch Pearson type-III and Gumbel distributions are employed. Computer algorithms are prepared for the purpose and PMF has been computed with the help of available limited historic record. The outome of the study is that, for the test case (Mirani dam), the probable maximum flood (PMF) may be adopted of the order of 6.1 x 10-5 cusses.