Hydrologic Monitoring and Tubewell Performance in Shikarpur Tubewells Pilot Project 1978-79
Bibliographic details
Summary
The salient conclusions derived from the analysis presented in the repert are: ; 1. The utilization of the project tubewells on the basis of available pumping capacity, was only 32 per cent. ; 2. The average groundwater level is merely 3.0 feet below general ground level during October as against the planned level of about 10 feet below ground level and it goes down to about 10 to 11 feet below ground level in the month of April but it still remains at about 3 feet above the targetted level in April. ; 3. Watertable is not lowering down due to low pumpage. ; 4. The pumping capacity of the project tubewells has decreased by about 19 per cent since acceptance. ; 5. The median value of specific capacities of tubewells has decreased by about 16 per cent since acceptance. ; 6. None of the project tubewells was found to have any sand blowing problem. ; 7. Wire to water efficiency of tubewells ranges from 32 to 49 per cent.