PC-1 proforma Khairwala Sub Unit Lower Rechna Remaining (SCARP-V), 1980

Bibliographic details

Summary

This PC-I Performa deals with the Khairwala subunit. The proposal envisages the construction of Khairwala drainage system and drainage tubewells alongwith the appurtenant structures. The drainage system proposed consists of 59 miles of main drain and 65 miles of branch drain to take care of surface runoff and act as disposal channel for tubewell effluent. Ninety-six drainage tubewells of 2.5 cusec capacity alongwith 35 miles of disposal channels and appurenant sturctures have been proposed to control the sub-soil water level. The work is proposed to be completed in a period of four years. The capital cost is estimated at Rs. 344 million, which includes Rs. 2.6 million as foreign exchange. The annual operation and maintenance cost is estimated to be 7.24 million rupees. The project has a cost benifit ratio of 1: 1.2 and internal rate of return as 15%.