Performance of Two Stage Stabilization Ponds
Bibliographic details
Summary
The Institute of Public Health Engineering and Research has been engaged in carrying out research studies on pilot scale facultative stabilization ponds operated in parallel since 1972.The results indicated that facultative ponds could satisfactorily be operated at 4 ft. depth and at loading rates ranging from 75 to 300 lbs BOD/acre day to give BOD removal efficiency range of 63.5 to 86.7%. Owing to deteriorating water quality in river Ravi, stringent effluent quality desired to dispose off Lahore sewage in the river after 1986 and inview of rising costs of land it was envisaged that a study of waste stabilization ponds operating in series may help solve the Lahore sewage treatment problem in an economical way. The two ponds used for the investigations are each 150 ft by 60 ft (46 m by 78m) at the top with a total depth of 5ft(1.5m) and side slops of 1.5 (horizontal) to 1 (vertical). For the present investigations it was proposed to operate the ponds at a depth of 4 ft. However, soon after commencement of the operation, some leakage from pond 3 towards pond 2, was detected and therefore for safety purposes operational depths were some what reduced. The facility in general showed satisfactory performance and in terms of BOD and coliforms,on average 79.9% and 99.99% and reductions were achieved during the investigations period.(L.B.)