PakCat catalogue record

"Performance Evaluation of Sump-9, Forth Drainage Project" 'Source Title' Proceedings of 5th International Drainage Workshop, February 8-15, 1992, Lahore Volume III

By Muhammad Nawaz Bhutta

Bibliographic details

Summary

The main objectives of Fourth Drainage Project (FDP), Punjab, Pakistan are lowering of the water table, halt loss of agricultural land to salinity and reclaim salt affected areas to increase the crop production. The Netherlands Research Assistant Project in collaboration with IWASRI initiated studies in one sump unit (SIB9) to monitor the drainage system and improve design criteria for drainage systems in Pakistan. Data were collected from the field for the period from January, 1990 to June, 1991. The methodology of data collection and analysis for this type of drainage system are reviewed. Traditional drainage research procedures are not possible and alternatives are suggested. Functioning of manholes and drains was monitored. Soon after the laying of the lateral and collector drains the water table reached the level of the drains and remained below or at the drain level for most of the year. Because the sump is pumping from the top of a large aquifer and most of the system is above the water table, pumping had very little effected on surrounding areas. The average discharge coefficient calculated from water balance study was 0.37 mm/day compared to a design discharge of 2.44 mm/day. Rainfall during the observed period was less than the design rainfall deep percolation caused by the warabundi irrigation system was than expected. Canal closure was clearly noticeable in the water table hydrograph.