PakCat catalogue record

River Training Management in Pakistan: The Implementation Experience and Future Strategies 'Source Title' Proceedings of the National Workshop on Water Resources Achievements and Issues in 20th Century and Challenges for the Next Millennium, Islamabad - Pakistan, 28-30 June 1999

By Shakir, A. S.

Bibliographic details

Summary

River training in its broader application covers all engineering works constructed on a river system to guide and confine the flow in the river channel and to control and regulate the river bed configuration. Pakistan's rivers are characterized by highly active meandering channels and moving beds due to erodible nature of the river plains and large variations in both the discharge and sediment concentration. Seasonal floods are also regular feature of river flow pattern in the country. Extensive efforts have been made to train the rivers and to protect the adjoining areas from erosion and flood damages. This has mainly been done with the help of a network of embankments protected with different types of spurs. Despite sizeable investments of billions of rupees on their construction and maintenance was made these measures have generally proved to be inadequate in achieving the perceived objectives, particularly in the event of major floods. The paper reviews the existing practices and procedures used for flood protection and river training in Pakistan. Performance of these facilities during the past floods has been critically examined. The analysis indicates that the alignment / design of bunds and spurs is generally based on engineering judgement substantiated by physical model tests, but inadequate consideration is given to the river morphology and integrated planning on river reach basis. The paper also discusses various approaches used for prediction of river behaviour and brings out the need for carrying out rational analysis using the state-of-the-art approaches under different flow scenarios before finalizing the alignment of river training / protection works. It has been concluded that any trial and error solution or isolated measures without proper evaluation of the river behaviour could add considerably to the overall cost of the projects. The alternatives therefore need to be investigated in the context of the possible long-term changes in river regime and channel planforms using both the physical as well as the mathematical model studies.