Panjnad Abbasia Salinity Control and Reclamation Project (Scarp-VI); Planning Report for Units II, III, IV, and V
Bibliographic details
Summary
This report presents the planning for the remaining area of 14,60286 acres covered by SCARP Panjnad-Abbasia. This ara has been subdivided into four development units i.e Units-II, III, IV and V. Thus the entire area of SCARP VI i.e 16,76,520 acres has been planned by us for development. In this report it is proposed installation of 2144 irrigation tubewells for development of 8,00, 720 acres in non-saone zone. Drainage tubewells numbering 391 are proposed in the intermediate zone. Out of the remaining 178 drainage tubewells only 26 will be used for experiments on saline water agriculture. In all 2713 tubewells are proposed to be installed for eradication of the evils of salinity and waterlogging. The irrigation channels in the saline zone are proposed to be remodelled for increasing cropping intensity from 80 to 120%. Finally an intensity of 150% is proposed for Units-II & III, 120% in Unit -IV and 140% in Unit-V. Thus the entire area of SCARP VI i.e 16,76,520 acres has been planned by us for development. In this report we have proposed installation of 2144 Irrigation Tubewells for development of 8,00,720 acres in non-saline zone. Drainage tubewells numbering 391 are proposed in the intermediate zone. Out of the remaining 178 drainage tubewells only 26 will be used for experiments on saline water agriculture. In all 2713 tubewells are proposed to be installed for eradication of the evils of salinity and waterlogging. The irrigation channels in the saline zone are proposed to be remodelled for increasing cropping intensity from 80 to 120% . Finally an intensity of 150% is proposed for Units-II & III, 120% in Unit-IV and 140% in Unit-V.