Performance of Tubewells Installed under Jaranwala Reclamation Scheme SCARP-1
Bibliographic details
Summary
The installation of tubewells in Jaranwala Reclamation Scheme was undertaken by Irrigation and Power Department 1957 to reclaim 35868 acres of land affected by salinity and waterlogging. The scheme was originally designed for 133 tubewells but at present 140 tubewells are working. The additional 7 tubewells were installed by WAPDA. Unfortunately the test data was probably not collected on energisation of these tubewells so the present data has been compared with the data collected in 1964 by the staff of WAPDA. The present report gives the existing condition and performance data of these tubewells regarding the maximum discharge, draw-down, sub-soil water level, quality of ground water, power consumption etc. Other relevent data such as designed discharge, type of pumping machinery, horse power of motors etc. has also been added to make the report information.