An Interim Report on the Effectiveness of Tubewell Reclamation in Former Punjab Area of West Pakistan, 1961
Bibliographic details
Summary
The study described in this report forms what might be called a progress report on what can be accomplished with tubewell relamation schemes of the type being consturcted and being planned for the control of waterlogging and salinity in the former Punjab area. From a purely technical stand point there is no doubt that, if properly operated and miantained, the tubewell relamation projects are capable of fulfilling the dual purposes of improving driange conditions though a lowering of the water table and providing the additional water needed for relamation. When the lands have been reclaimed, the tubewell water with existing canal supplies will make it possible to greatly increase crop production. Doubts still exist in the minds of some, however, as to the effectiveness of tubewell relamtion. This is understandable because of the fact that for various resons some of the earlier tubwell project were incaple of effectively coping with the problem and none of the"modern tubewell projects consturcted to date have, unitl recently beeb in operation for a sufficiently long period of time to conclusively demonstrate that adequate drinage can be achieved and lands can be reclaimed with such facilites. The orginal Agreement between WAPDA and the Development Loan Fund covering DLF aid in financing part of the cost of Salinity Control Project No.1, for example contained a provision requiring contruction of the project in two pahses and the successful demonstration that the objectives of the project could be achieved prior to completion of the second phase. Actually this requirement was later waived because interruption of the construction program would be costly and would result in more land going out of production during the time required to apprasie the result of the first phase than would be reclaime dby these works.(LB)