Procedure for First Filling of the Reservoir Summer 1974 Operating Rules and Results Tested Against 106 Years of Record Supplement No.3 Final Report
Bibliographic details
Summary
This report presents the results of works carried out since June 1973 and the revised filling curve and operating rules resulting therefrom. Results of studies of emergency drawdown dering the first filling of Tarbela Reservoir, and of other supplementary studies are presented in report