Meteorological Criteria, a for the probable maximum flood into Kalabagh Reservoir
Bibliographic details
Summary
The probale maximum flood (PMF) on the Indus River at Kalabagh dam site will result from a severe combination of probable maximum precipitation (PMP) on the lower 22,000 sq.mi of the drainage area above the dam site, simultaneous with a severe seasonal snowmelt flood originating within the upper 89,000 sq.mi of the basin, together with antecedent rain to wet the lower basin. Because of rapid travel of flood flows in the streams of the lower basin, a PMP storm of three days duration or less is controlling. The type of meteorological situation expected for this PMP storms is the same as for major historical floods: a tropical depression of Bay of Bengal origin in the monsoon season, passing over the basin under the influence of a disturbance of the atmospheric westerly flow to the north of the basin. The magnitude of the 72-hr PMP has been estimated and combined with the snowmelt flood and antecedent rain in a probable maximum storm sequence (PMSS) leading to the PMF. Simplified hydrologic calcuations show a PMF volume in 72 hours of 11 million acre feet into planned Kalabagh Reservoir. Suggestions are given on assessing the time distribution of the 72-hr flood volume. In the analysis of major storms, considerable effort was made to obtain the best estimate of (1) rain volume, (2) rain loss to infiltration, and (3) storm runoff fraction of discharge hydrograph by simultaneous analysis of all three, such that (1) - (2) = (3). This was particularly important for the storm of August 1929, the largest of record as parts of the basin were essentially devoid of precipitation gauges at that time. One of the combinations that must be evaluated for the PMF is the rain flood plus the snowmelt flood. That combination is the subject of this report. The effects of failures of natural dams is a subsequent and separate matter being addressed by Kalabagh Consultants, and is not included in this report.