PakCat catalogue record

Annual Report for the Year 1975: Hydraulic Division

Bibliographic details

Summary

CONTENTS: Mithawan Hill Torrent Regulating of Flood Water, Scour and Side Erosion of Fall and Bridge at R.D. 184650 Mailsi Cnal, Correction of River Approach to the Rail Cum Road Bridge on the Eastern Channel of River chenab near Chiniot, Protection of Right Marginal Bound upstream of Qadirabad Barrage, /Lowering of flood Height above Spur No.5 & 9 upstream of Balloki Headworks, Proposed Dadu Moro Road Bridge on River Indus, Spllway of Rasul Power House, Tunnel No.2, Restored Design in event of Emergency Dumping of Reservoir, Tarbela Dam, Tunnel No.3, Oulet Structure, Tarbela Dam, Left Bank Irrigation Tunnel