Hydrologic Monitoring and Tubewell Performance, Satiana Pilot Project SCARP-V, 1990-91
Bibliographic details
Summary
The aggregate discharge of tested tubewells was 1.96 percent more than their design discharge. The discharge of tubewells be controlled down to their design values with the help of sluice valves as higher entrance velocities, thus caused may end in the early choking of tubewell screens. In 1990-91 the specific capacity of 17 and 4 tubewells reduced upto 15 percent and 16-25 percent respectively. More-over one tubewell underwent reduction of 26-30 percent since acceptance test. Rehabilitation of 5 deteriorated tubewells registering reduction from 16-30 percent in their specific capacity may be under taken at the earliest. The median specific capacity of tubewells tested during 1990-91 had shown no reduction. For true reduction in medium specific capacity, it is necessary that all the tubewells should be in running condition. No sand content was found in the effluents of listed tubewells. The wire to water efficiency of 10 tubewells was less than 30 percent due to frictional losses in their pumping units. In June 1991, the disaster area increased 6.8 percent as compared to June 1990. The main cause of increase was due to 38.74 percent less pumpage in 1990-91 as per previous year. (L.B.)