In 1990-91, the specific capacity of 2 and 7 tubewells reduced upto 15 percent and 16 to 25 percent respectively. Moreover 03 tubewells showed reduction between 26-50 percent which need to be under taken for rehabilitation. However, 06 tubewells which have registered reduction of more than 50 percent may be checked for replacement. In 1990-91, the median specific capacity of the tested tubewells decreased form 28.3 to 25.4 1pm/dm (19 to 17 gpm/ft) of drawdown. This is based on tests perfomed on 33 tubewells only. There is 3.3 percent increase in disaster area (o-150 cms) from June 1989 to June 1990 which is mainly due to less pumpage during 1989-90.None of the tested tubewells found blowing sand. As the actual discharge capacity of the tested tubewells is 5.6 percent less than designed capacity, it is recommended that discharge of tubewells be increased by rehabilitating the deterirated tubewells.(L.B.)