Kalabagh Dam Project; Sedimentation Studies Proposals for Further Data Collection
Bibliographic details
Summary
This report should be read in conjunction with the T.M. No.2 on "Review of Existing Sediment Data" which includes comments on existing data and recommendations for processing data already collected. The aim of this report is to identify the additional field work that is required in connection with sedimentation studies for Kalabagh. Brief details of six items and justification for them are presented in section 2 under the following headings: (1) Additional wet season data (suspended sediment) (2) Silt monitoring at Tarbela and Mangla Reservoirs (3) Bed material sampling (4) River channel monitoring surveys (5) Setting up new sediment measuring stations (6) Survey data for Indus. The Agency likely to be responsible for carrying out most of the work is the Surface Water Hydrology Project (SWHP) of WAPDA though other organisations including Kalabagh Consultants, Tarbela Dam Organization and Mangla Dam Organization will also be involved. Recommendations for implementing the proposals are outlined in section 3 (using the same headings as above) but detailed arrangements required to organise the programme of work and costs involved are currently being evaluated and are the subject of correspondence and discussion between SWHP, WAPDA and Kalabagh Consultants.