According to the decision of the special CDWP meeting, a Special Task Force (STF) consisting of experts from the Ministry of Water and Power, Govt. of Baluchistan, Planning Division and WAPDA was constituted by the Ministry of Water and Power on Aug. 8,1983 (Annexure-A). During the first meeting of Sept. 3,1983. STF considered the technical and economic project issues and decided that:- Hydrological studies, including water yield, sedimentation rate, operation studies and maximum flood for spillway design would be reviewed by WAPDA and if found necessary the project features would be modified accordingly. - Possibliliteis for the generation of hydel power would also be investigated. - A revised feasibility report would be prepared and submitted to the Special Task Force.(LB)