PakCat catalogue record

Swabi SCARP, PC-I Proforma, 1988

Bibliographic details

Summary

The irrigation system improvement to be implemented under Swabi SCARP would achieve the following broad objectives. (a) Enlargement/ remodelling of main channel of Abazai branch and its distributaries and minors.(USC) (b) Remodelling of entire Kalpani distributary. (LSC). (c) Installation of sub surface drains (1570 miles) in an area of 75,300 acres to lower and control the ground water table at such levels which shall facilities growth in agricultural productivity as well as eliminate soil salinization.