Note on the Groundwater Potential of Darwaza Kolpur Area in the Vicinity of the Proposed State Cement Factory
Bibliographic details
Summary
Conclusions and Recommendations: For the following reasons, further investigations are not recommended in the Darwaza Kolpur area. ; The groundwater storage of Darwaza Kolpur area is limited by the small extent of the area and the maximum drawdown allowable. ; Any further investigations will shown that the maximum groundwater storage assessment is over estimated so that it is unreasonable to foresee any significant extraction after about 10 years of pumping. ; The groundwater potential of Darwaza-Kolpur area appear to be not affected by any kind of recognisable recharge and must be assessed from the estimation of the groundwater storage.