PakCat catalogue record

Chasma Right Bank Canal Effects of Natural and Induced Sediment on the Unline Reach

Bibliographic details

Summary

A desk study has been carried out to make a behavioural evaluation of first unline dreach (RD 0-120= of CRBC that has been just completed and put to test operation in January 1987. The performance evaluation has been made with respect to its seepage loss and predictions of future performance with respect to anticipated silt entry into the canal and its sediment transport capacity have also been made. Field data observed and compiled by ACOP, Chashma Barrage Project office and ther formations have been utilised. Observed discharge data have been used to assess the seepage loss that would have occured, had the canal been run at fully supply discrage. The performance of upper reach improved rapidly from the point of view of ssepage loss primarily due to resuspendsion of fine deposits from the bed of Paharpur Feeder and their migration to the upper reach to imperviate the canal bed and sides there. The re -suspension of the sediments was caused by manual meachnical and hydraulic means.(LB)