Pump And Tubewell Performance In Ara Scheme Of SCARP-IIB 1975-76
Bibliographic details
Summary
The discharge of 318 tubewells 100% have registered positive/no change or reduction upto 20% with respect to designed pumping capacities of tubewells.Median specific capacity of 319 tubewells has decreased from 84 to 77 gpm per foot of drawdown,thereby showing reduction of 8 % since acceptance tests.