PakCat catalogue record

"Effect of Karez Improvements and Future Development Plan in Balochistan" 'Source Title' Proceedings of ISM/R Symposium, Lahore 11-13 April 1993 Volume 8

By Ijaz Ahmed Humayun

Bibliographic details

Summary

In Balochistan, karez (sloping tunnel) is a very old source of groundwater supply which does not use external energy. This gravity flow system has, in fact, served as a life-line for the region's domestic and irrigation water supply. With intensive installation of tubewells and power driven pumps in the open dugwells and the absence of recharging facilities, the groundwater balance has been disturbed in many parts of the province. The high cost of cleaning and deepening the karez tunnels and access wells to tap deeper aquifer poses serious maintenance constraints. As a result, the performance of the karez has been badly affected and its flow has considerably decreased and, in many cases, ceased. On an experimental basis, WAPDA rehabilitated and improved representative karezes in different areas of the province. As a result of the encouraging findings of these research studies, which enhanced the karez flows five times with a reduced maintenance cost, the Government of Balochistan requested WAPDA to prepare a comprehensive plan for rehabilitation and improvement of all karezes (about 1000) in Balochistan. To identify various problems under similar conditions, Balochistan Province was divided into three regions, namely, Quetta, Loralai and Mekran. Twenty-six sample karezes were studied in detail to form a plan for their improvement and rehabilitation. Data collection, surveys and investigations were carried out in individual karezes according to a comprehensive program prepared based on research already carried out. The data was evaluated to plan necessary improvement and rehabilitation treatments. The required improvements, in priority order, are tunnel cleaning (88%) capping of access wells (100%), tunnel lining (69%), additional brach karezes (65%) tunnel deepening (10%) storage tank lining (46%), open channel lining (35%), deep boring in karez wells (30%), iow retention dams (50%), flood protection (23%) and recharge reservoirs (15%). Further evaluation indicates that the proposed improvements are economically viable. It is recommended that the proposed karez implementations should be carried out in two phases long short-term, one long -term) and should should involve the water users in sharing the cost as far as possible.