As a result of preliminary studies it is estimated that a 200 ft. high concrete gravity dam (with 30 ft.high gates) constructed at site No.4 (located 9 miles downstream of Chinari discharge site), provides firm power of the order.of 170 MW and peaking capacity available during April to August is 1000 MW. At site No.3 (18 miles downstream of Chinari discharge site) where a 10 ft. high weir with 35 ft.high gates, is proposed to be contructed, the firm power is of the order of 88 MW and peaking capacity available during April to August is 540 MW. At Barsala which is located 1.5 miles upstream of Kohala discharage site and where a 200 ft. high concrete gravity dam with 30 feet, high gates is proposed to be constructed the firm power is of the order of 82 MW and peaking capacity available during April to August is 500 MW. The tentative estimated cost of the project for site No.4 is Rs.8542 million, for site No.3 is Rs.4750 million and for Barsala is 2232 million. The cost per K.W in case of site No.4 works out to Rs.8542/- per K.W for site No.3 works out to Rs.8797/- per K.W and for Barsala works out to Rs.4464/- per K.W